Popular searches

Categories

Add to a mood board

Loading your mood boards.

Shop › Building and renovation › Groundworks and foundations

Groundworks and foundations

Foundations
Strip foundationsTrench fillRaftPiled
Ground floor
Concrete slabBeam and blockInsulated raft

Everything below ground, done properly. A groundworks contractor sets out, digs and pours the foundations, lays the drains and builds up to the floor slab, ready for the walls to go up.

Specifications

Usually includesSetting out, excavation, concrete foundations, drainage runs, blockwork to damp course, the ground floor slab or beam and block floor
Typical time on site2 to 6 weeks
Good to knowThe foundation type comes from your structural engineer and the ground report. Building control inspects the trenches before concrete goes in.

Your options explained

Foundations

The foundation type your engineer has specified, if known.

Strip foundations
Concrete poured in trenches under the walls. The most common type.
Trench fill
Trenches filled almost to the top with concrete. Quick on firm ground.
Raft
One reinforced slab under the whole house, for soft ground.
Piled
Piles driven deep to firm ground, for clay or poor soil.

Ground floor

How the ground floor will be built.

Concrete slab
A poured concrete floor on insulation.
Beam and block
Concrete beams with blocks between, laid over a void.
Insulated raft
Foundations and floor in one insulated slab.

How it works

1 · Describe it

Your postcode and the job in your own words. Photos help but are not required.

2 · We match

Tradespeople who cover your address see the request, and each profile shows the checks that tradesperson has passed.

3 · You get a quote

On your own page, with a link you keep. It updates itself as responses come in.

More jobs in Building and renovation

Your area

See local installers and services near you. Products delivered nationally always show.

or

Filters

Show
Sort