Popular searches

Categories

Add to a mood board

Loading your mood boards.

Shop › Building and renovation › Sitework and foundations

Sitework and foundations

Foundation
Footings and stem wallMonolithic slabRaft slabPiers or piles
Floor
Concrete slabCrawl spaceBasement

Everything below ground, done properly. A foundation contractor lays out, digs and pours the footings, runs the drains and builds up to the floor slab, ready for the walls to go up.

Specifications

Usually includesLayout, excavation, concrete footings, drainage runs, foundation walls, the slab or a framed floor over a crawl space
Typical time on site2 to 6 weeks
Good to knowThe foundation type comes from your structural engineer and the soil report. The building inspector checks the footings before concrete goes in.

Your options explained

Foundation

The foundation type your engineer has specified, if known.

Footings and stem wall
Concrete footings with a short wall on top. A common type with a crawl space.
Monolithic slab
Footing and slab poured together in one go. Quick on firm, level ground.
Raft slab
One reinforced slab under the whole house, for soft ground.
Piers or piles
Posts driven or drilled deep to firm ground, for poor soil.

Floor

How the ground floor will be built.

Concrete slab
A poured concrete floor on a gravel and vapor barrier base.
Crawl space
A framed wood floor over a short, ventilated space.
Basement
A full-height lower level with poured or block walls.

How it works

1 · Describe it

Your ZIP code and the job in your own words. Photos help but are not required.

2 · We match

Contractors who cover your address see the request, and each profile shows the checks that contractor has passed.

3 · You get a quote

On your own page, with a link you keep. It updates itself as responses come in.

More jobs in Building and renovation

Your area

See local installers and services near you. Products delivered nationwide always show.

or

Filters

Show
Sort