Shop › Building and renovation › Home addition
That combination is not available. Choose another option.
More room without moving. A local builder takes a single or two-story addition from foundation to finished rooms.
| Good to know | Building permits and inspections are required, and zoning rules may apply. Have plans? Say so. |
|---|---|
| Usually includes | Foundation, framing, roof, windows and doors, electrical, plumbing, drywall, inspections |
| Typical time on site | 3 to 6 months |
How many floors the addition will have.
Where the addition goes against the house.
The shape of the roof on the addition.
Features that bring in light or open the addition to the yard.
Your ZIP code and the job in your own words. Photos help but are not required.
Contractors who cover your address see the request, and each profile shows the checks that contractor has passed.
On your own page, with a link you keep. It updates itself as responses come in.