Find out what is under the grass before you design foundations. A geotechnical engineer digs test pits or borings and tests the soil, so the foundation and drainage are right the first time.
| Usually includes | A review of the site history, test pits or soil borings, soil samples and lab tests, a written report with foundation advice |
|---|---|
| Typical time on site | 1 to 2 days on site, report in 2 to 3 weeks |
| Good to know | Expansive clay, fill or a high water table can change the whole foundation design. A percolation test tells you if a septic system will drain. |
The tests you need. Your engineer or lender may name them.
Anything you already know about the site. Pick any that apply.
Your ZIP code and the job in your own words. Photos help but are not required.
Contractors who cover your address see the request, and each profile shows the checks that contractor has passed.
On your own page, with a link you keep. It updates itself as responses come in.