Find out what is under the grass before you design foundations. A ground engineer digs trial pits or boreholes and tests the soil, so the foundations and drainage are right first time.
| Usually includes | Desk study of the site history, trial pits or boreholes, soil samples and lab tests, a written report with foundation advice |
|---|---|
| Typical time on site | 1 to 2 days on site, report in 2 to 3 weeks |
| Good to know | Clay, made ground or a high water table can change the whole foundation design. A percolation test tells you if a soakaway or treatment plant will drain. |
The tests you need. Your engineer or warranty provider may name them.
Anything you already know about the site. Pick any that apply.
Your postcode and the job in your own words. Photos help but are not required.
Tradespeople who cover your address see the request, and each profile shows the checks that tradesperson has passed.
On your own page, with a link you keep. It updates itself as responses come in.