Shop › Building and renovation › Steel beams and structural steelwork
That combination is not available. Choose another option.
Strong openings and open rooms. A builder or steel erector supplies and fits the steel beams or frame your engineer has designed, with propping, padstones and fire protection done properly.
| Usually includes | Temporary propping, cutting in, supplying and lifting the steel, padstones, fire protection and making good |
|---|---|
| Typical time on site | 1 to 5 days |
| Good to know | Steel is made to the engineer's sizes, so have calculations before asking for prices. Building control will want to see it before it is boxed in. |
What the steel is holding up.
How the steel will look when the job is done.
Your postcode and the job in your own words. Photos help but are not required.
Tradespeople who cover your address see the request, and each profile shows the checks that tradesperson has passed.
On your own page, with a link you keep. It updates itself as responses come in.