SAP energy calculations and air test

Stage
Design stageAs builtBoth stages
Also needed
Air tightness testEPCOverheating check

The energy paperwork every new home needs to pass building regulations. An energy assessor runs the SAP calculations from your drawings, advises on insulation, heating and glazing to pass, and does the air tightness test at the end.

Specifications

Usually includesDesign stage SAP from your drawings, advice to meet the targets, an as-built SAP, an air tightness test and the EPC on completion
Typical time on siteDesign SAP in about a week; air test half a day on site
Good to knowBuilding control will ask for the design stage SAP before work starts. Getting it early can save money on insulation and heating choices.

Your options explained

Stage

Where your build is now.

Design stage
Calculations from the drawings before you start, for building control.
As built
Updated calculations once the home is built, for the final certificate.
Both stages
The design calculations now and the as-built set at the end.

Also needed

Tests and certificates often bought with the SAP. Pick any.

Air tightness test
Measures how much air leaks out, needed before sign-off.
EPC
The Energy Performance Certificate for the finished home.
Overheating check
Shows the new home will not overheat in summer.

How it works

1 · Describe it

Your postcode and the job in your own words. Photos help but are not required.

2 · We match

Tradespeople who cover your address see the request, and each profile shows the checks that tradesperson has passed.

3 · You get a quote

On your own page, with a link you keep. It updates itself as responses come in.

More jobs in Building and renovation

Your area

See local installers and services near you. Products delivered nationally always show.

or

Filters

Show
Sort