Shop › Building and renovation › Site clearance and demolition
That combination is not available. Choose another option.
Clear the way for the new build. A groundworks contractor takes down old buildings safely, removes trees, scrub and spoil, and leaves you a level, ready site.
| Usually includes | An asbestos check if needed, demolition, waste sorted and taken away, stumps and scrub cleared, the site levelled |
|---|---|
| Typical time on site | 2 days to 2 weeks |
| Good to know | Older buildings need an asbestos survey before demolition. Trees may be protected, so check with the council before felling. |
What needs to go. Pick any.
Related work often done at the same time.
Your postcode and the job in your own words. Photos help but are not required.
Tradespeople who cover your address see the request, and each profile shows the checks that tradesperson has passed.
On your own page, with a link you keep. It updates itself as responses come in.