Shop › Building and renovation › Chimney breast removal
That combination is not available. Choose another option.
Reclaim the space an old chimney takes up. A builder removes the chimney breast, supports what is left above with steel or brackets your engineer has designed, and makes good the walls, floor and ceiling.
| Usually includes | Dust protection, removing the breast, steel or gallows brackets, building control sign-off, plastering and making good the floor |
|---|---|
| Typical time on site | 2 to 5 days |
| Good to know | You need building regulations approval, and often a party wall notice in a terrace. The stack above must be supported or taken down too. |
How much of the chimney comes out.
How the chimney left above is held up, if known.
Your postcode and the job in your own words. Photos help but are not required.
Tradespeople who cover your address see the request, and each profile shows the checks that tradesperson has passed.
On your own page, with a link you keep. It updates itself as responses come in.