Shop › Building and renovation › Timber frame or SIP house erected
That combination is not available. Choose another option.
A weathertight shell in weeks, not months. A frame company designs, makes and erects a timber frame or structural insulated panel (SIP) shell on your foundation, ready for the roof, windows and siding.
| Usually includes | Frame design and engineering, factory-made panels, delivery, crane and erection on site, the roof structure if ordered |
|---|---|
| Typical time on site | Shell up in 1 to 3 weeks once made |
| Good to know | Panels are made to order, so lead times can be several months. The foundation must be accurate to a fraction of an inch for the frame to sit right. |
How the walls are made.
How much the frame company supplies.
Your ZIP code and the job in your own words. Photos help but are not required.
Contractors who cover your address see the request, and each profile shows the checks that contractor has passed.
On your own page, with a link you keep. It updates itself as responses come in.