Popular searches

Categories

Add to a mood board

Loading your mood boards.
A bright empty room with laminate boards partly laid across underlay and a tapping block resting on the new floor

Guides › DIY & maintenance

How to lay laminate flooring: a first-timer’s room guide

4 min readPublished

Click-together laminate turned floor laying from a trade skill into a long weekend job, and a careful first-timer can genuinely produce a floor that looks professional. The catch is that laminate is unforgiving of bad preparation: every hollow in the subfloor becomes a creak, and every missing expansion gap becomes a lifted ridge next summer. Learning how to lay laminate flooring is therefore mostly about the hours before the first board clicks together. Work through the sequence in order and the laying itself is the easy part.

Let the boards acclimatise

Laminate is mostly wood fibre, and it swells and shrinks with the room. Stack the unopened packs flat in the room where they will be fitted for at least forty-eight hours before laying, so the boards adjust to its temperature and humidity. Skipping this is the classic cause of joints opening up in the first month. While you wait, clear the room completely, remove any old flooring, and pull out old staples and protruding nails.

Before you lift an old floor

If the floor you are taking up is vinyl or thermoplastic tile laid before 2000, stop before you start levering. Those tiles, and the black bitumen adhesive under them, can contain asbestos, and so can the backing of old lino. Left intact and stuck down they are not doing any harm. The risk comes from breaking, sanding or grinding them, which is exactly what lifting a stubborn old floor turns into.

There are three sensible ways forward. Often the best is to leave them alone: if the old tiles are sound and flat, underlay and laminate can usually go straight over the top and nothing is disturbed at all. If the floor has to come up, or you simply want to know what you have, a sample can be tested by a laboratory for a modest fee, and that answer is worth having before you commit a weekend to it. If it comes back positive, or you would rather not handle it either way, a contractor who does this work will take it up properly. The one thing not to do is attack an unknown old tiled floor with a scraper, a grinder or a floor sander, because that is the single action that turns a harmless floor into airborne fibres.

Get the subfloor flat, dry and clean

Run a long straight edge across the subfloor. Undulations bigger than about three millimetres over a metre need dealing with: high spots sanded or planed, low spots filled with a self-levelling compound on concrete or a hardboard layer on timber. On a concrete subfloor, check for damp; a new screed must be fully dry, and older concrete on the ground floor should have a damp proof membrane beneath the underlay, which is built into many underlays for exactly this. Sweep and vacuum until the floor is genuinely clean, because a single trapped grain of grit clicks underfoot forever.

Underlay and the expansion gap

Roll the underlay out across the whole floor, taping the seams edge to edge without overlaps. Underlay evens out tiny imperfections, softens the sound of footsteps, and adds a little warmth. Then commit to the rule that governs the whole job: the floor must float. Leave a gap of ten to twelve millimetres between the boards and every wall, pipe and doorframe, held with spacers while you work. Laminate expands as a single sheet, and a floor laid tight to the walls has nowhere to go but upwards.

Laying the boards

  1. Plan the direction: boards usually run parallel with the longest wall or with the main light. Measure the room width and check the final row will not be a sliver; if it would be under about five centimetres, trim the first row narrower to balance the two edges.
  2. Lay the first row with the cut edge to the wall, spacers in place, and check it is dead straight, because every following row copies it.
  3. Click each new board into the previous row at an angle and lower it flat. Tap joints closed with a tapping block, never a bare hammer on the board edge.
  4. Stagger the end joints by at least thirty centimetres row to row, starting alternate rows with the offcut from the row before. Random staggering looks better than a rigid step pattern and wastes less.
  5. At radiator pipes, drill a hole two centimetres larger than the pipe, cut a wedge to the board edge, fit the board and glue the wedge back behind the pipe.
  6. For the last row, measure at both ends, rip the boards to width, and pull the joint closed with a pull bar.

Doorways, thresholds and trim

The professional touch at doorways is undercutting the frame: lay an offcut of laminate on a piece of underlay next to the architrave, rest a saw flat on it, and cut the frame so the board slides underneath. It looks far better than scribing around the frame. Cover the expansion gap at the walls with beading pinned to the skirting, never to the floor, or remove and refit the skirting boards over the gap for the cleanest look. Fit a threshold strip at each doorway matched to what is on the other side, and leave the expansion gap beneath it too.

Where laminate should not go, and when to call a fitter

Standard laminate and steamy, wet rooms do not mix; water that sits on the joints swells the fibre core permanently. For bathrooms, use a waterproof-core board sold for the purpose, or choose vinyl flooring instead. Herringbone patterns, rooms that are badly out of square, and floors with lots of pipework are where a professional fitter earns the money in a single day, and our guide on checks before hiring a tradesperson covers finding a good one.

Common questions

Do I really need underlay for laminate flooring?

Yes. Underlay smooths small imperfections, quietens footsteps, insulates a little, and on concrete it carries the damp proof membrane. Laying laminate straight onto a subfloor voids most manufacturer guarantees.

Which direction should laminate boards run?

Convention says parallel to the main window so the light runs along the joints, or along the longest wall in a narrow room to stretch it visually. In most rooms either looks right; pick one and keep it consistent through connected spaces.

Can I lay laminate over underfloor heating?

Usually yes, if the board and underlay are both rated for it and the floor temperature stays within the limit the manufacturer states. Check the packs before buying and bring the heating up slowly after fitting.

how to lay laminate flooringlaying laminatelaminate underlaylaminate expansion gap

Describe your job and a verified local tradesperson comes back with a priced quote you can accept online.

Get a real quote →

Planning a job at home? Design the room, save your ideas and get quotes in the FixTrade app.

See the app →