Popular searches

Categories

Add to a mood board

Loading your mood boards.
A newly fitted bathroom with a walk-in shower and stone-effect tiles

Guides › Hiring a tradesperson

How much does a new bathroom cost in the UK?

2 min readUpdated

Bathrooms are the room where budgets vary most, because the same four walls can hold a sensible refresh or a boutique hotel. As a realistic picture of new bathroom cost in the UK: a like-for-like replacement of suite and tiles starts around £4,000 to £6,000 fitted, a mid-range renovation with layout tweaks and quality fittings runs £6,000 to £10,000, and design-led projects with walk-in showers, underfloor heating and premium tiling climb past £12,000. The suite itself is rarely the biggest line. Labour and tiling are.

Where the money actually goes

The trades a bathroom really involves

A full renovation touches plumbing, electrics, tiling, plastering and sometimes carpentry. Many bathroom fitters cover most of this themselves and bring in a registered electrician for any notifiable work. A new shower circuit is notifiable wherever you are; whether altering an existing bathroom circuit is depends on how close the work sits to the bath or shower and on which nation you are in. If you are project-managing separate trades yourself, sequence matters: strip-out, first-fix plumbing and electrics, boarding and plastering, tiling, then second-fix and sealing. Our hiring guides cover vetting each trade, and the electrical rules appear in our guide to what an electrician does.

Choices that swing the price most

Three decisions move a bathroom quote more than any others. First, layout: keep the existing positions and the plumbing labour drops sharply. Second, the shower: a standard enclosure over a tray is far simpler than a wet-room-style walk-in, which needs tanking, gradient work and careful drainage. Third, tiling extent: half-height tiling with quality paint above looks sharp and saves days of labour. None of these compromise how the room works day to day, which is why fitters suggest them first when a budget is tight.

Getting quotes you can trust

Write a one-page brief before asking anyone to price: what stays, what moves, the fittings you want with model numbers where you have them, and the tiling extent. Ask for itemised quotes separating labour, materials and contingency, and ask who handles the electrical certification and how long the room will be out of action. Vague briefs produce padded quotes. Detailed briefs produce comparable ones, and the difference between three comparable quotes is genuinely informative in a way one big number never is.

Common questions

How long does a bathroom renovation take?

A straightforward like-for-like refit takes one to two weeks. Layout changes, wet rooms or discovered repairs push it to three. Add drying and curing time before heavy use of tiling and sealant.

Can I renovate a bathroom in stages to spread the cost?

Yes, in the right order: fix any leaks and ventilation first, then suite and flooring, then tiling and finishes later. Avoid staging work that would mean redoing tiling twice.

Do I need building regulations approval for a new bathroom?

A like-for-like replacement does not need approval. New drainage, structural changes and new circuits are covered, and notifiable electrical work has to be certified. That can be done either by a scheme-registered electrician self-certifying, or by notifying building control directly before the work starts. Ask which route your installer is using, and get the certificate either way.

new bathroom costbathroom renovationbathroom fittingbathroom quote

See typical prices for this job in your town

Describe your job and a verified local tradesperson comes back with a priced quote you can accept online.

Get a real quote →

Planning a job at home? Design the room, save your ideas and get quotes in the FixTrade app.

See the app →