Across the UK, the typical range for a like-for-like bathroom replacement is £4,000 to £6,000. Prices include VAT.
| Job | Typical range |
|---|---|
| Like-for-like replacement of suite and tiles, same layoutper bathroom | £4,000 to £6,000 |
| Mid-range bathroom with some layout changes and better quality productsper bathroom | £6,000 to £10,000 |
These figures are estimates to check a quote against. They are not a quote or an offer, and FixTrade does not set what tradespeople charge. The only real price is a written quote for your own home. Ranges checked November 2026.
For the full picture, read our guide to this job.
What moves the price
- Keeping the bath, basin and toilet where they are avoids moving pipes and the soil stack
- The amount of tiling: full-height tiles cost far more than tiling only the wet areas
- A walk-in shower or wet room floor needs waterproofing and a new floor build-up
- Product choices, from a basic acrylic bath to a freestanding or stone one
- Hidden problems found at strip-out, such as rotten floorboards or old lead pipes
- Underfloor heating, a heated towel rail on a new circuit or extra lighting add electrical work
What a quote should include
- Stripping out and disposing of the old bathroom
- Plumbing for the bath or shower, basin and toilet
- The suite, taps and shower
- Wall tiling or panels and new flooring
- Electrics for lighting and an extractor fan, with sealing and finishing
Rules that apply
- Electrical work in a room with a bath or shower, including new circuits, is notifiable under Part P of the Building Regulations in England and Wales and should be done by a registered electrician.
- Any work on a gas boiler or gas pipework during the job must be done by a Gas Safe registered engineer.
- A bathroom needs adequate ventilation under Part F of the Building Regulations, which normally means an extractor fan.
- Adding a new bathroom or moving the toilet connection to the drains can need Building Regulations approval; a straight replacement of the suite does not.
Typical prices by place
Labour is about 50% of the price of this job, and labour costs more where pay is higher. The ranges below adjust that part for each region.
East
East Midlands
London
North East
North West
South East
South West
Wales
West Midlands
Yorkshire and the Humber
Common questions
Why is my quote well above the price of the suite I chose?
The suite is often a small part of the bill. Strip-out, plumbing, tiling, electrics and finishing typically make up half the total or more.
How much does moving the toilet or shower add?
It varies with the pipe runs, but changing the layout is the main reason a job moves from the £4,000 to £6,000 band into £6,000 to £10,000.
Do bathroom quotes include tiles and flooring?
Not always. Some include supply of everything, others allow a sum for tiles or expect you to buy them, so check what is supplied and what is installed only.
Sources
- Office for National Statistics, Annual Survey of Hours and Earnings 2025: median hourly pay excluding overtime, full-time employees, by place of work
- Office for National Statistics, Census 2021 (England and Wales): tables TS046, TS044 and TS054
- Valuation Office Agency, Council Tax: stock of properties, 31 March 2026 (table CTSOP4.1)
The only real price is a quote for your home. Describe the job and tradespeople who cover your address can send you one.
Get quotes for this job →

