That combination is not available. Choose another option.
A deck built to last, in wood or low-maintenance composite, with steps, railing and lighting if wanted.
| Good to know | Raised decks usually need a permit; check local rules. |
|---|---|
| Usually includes | Footings and posts, frame, boards, trim, steps, railing |
| Typical time on site | 2 to 5 days |
What the deck boards are made of. Weigh upkeep, looks and budget.
How high the deck sits above the ground.
Extras to add to the deck.
Your ZIP code and the job in your own words. Photos help but are not required.
Contractors who cover your address see the request, and each profile shows the checks that contractor has passed.
On your own page, with a link you keep. It updates itself as responses come in.