Shop › Flooring › New hardwood floor installed
That combination is not available. Choose another option.
A real wood floor, supplied and installed. Choose the wood, the pattern and the finish; a local flooring contractor prepares the subfloor and lays it.
| Good to know | Engineered boards suit radiant heat and kitchens better than solid. |
|---|---|
| Usually includes | Subfloor preparation, underlayment or adhesive, installation, transitions, baseboard or quarter round |
| Typical time on site | 2 to 5 days |
How the floorboards are made. Both are real wood on top.
The type of wood, which sets the color and grain.
How the boards are laid out on the floor.
The protective coat on top of the wood.
Your ZIP code and the job in your own words. Photos help but are not required.
Contractors who cover your address see the request, and each profile shows the checks that contractor has passed.
On your own page, with a link you keep. It updates itself as responses come in.