Wired once, right, while the walls are open. An electrician installs data cabling, Wi-Fi access points, smart lighting and thermostat controls, so the house works the way you want for years.
| Usually includes | Design with you, data cables to each room, a network panel, Wi-Fi access points, smart switches and controls set up |
|---|---|
| Typical time on site | 2 to 5 days |
| Good to know | Cabling is far cheaper to put in at rough-in than later. Ask for a plan of every cable run, and for systems that work with more than one app. |