What to Agree with Your Contractor Before Work Starts

5 min readPublished

Choosing the right contractor is the hard part, and our guides on how to hire a contractor and the checks to make before hiring cover it. What comes next gets far less attention and causes far more arguments. Almost every job that ends badly does so over something that was never actually agreed upon, just assumed by both sides in slightly different ways. The fix is a conversation before work starts, ideally followed by an email confirming what you both said.

None of this needs to be adversarial. A good contractor welcomes it, because clarity protects them from a customer who remembers the job differently at the end. If someone bristles at being asked to put the basics in writing, that reaction is information worth having.

The Scope, in Writing and in Detail

An estimate that says one line and a number is not a scope. You want a description specific enough that a stranger could read it and know whether the job was finished. That means the rooms or areas covered, what is being removed or replaced, the make and model of anything significant being installed, the finish or specification where it matters, and just as importantly what is not included.

Exclusions are where the surprises live. Does the price include patching and finishing the drywall after the pipe runs, or does it leave you with open walls? Does a new bathroom price include the tile work, or only the fixtures? Is the painting afterward yours? Write the answers down. If you change your mind about anything later, that is completely normal, but agree on the cost of the change at the time rather than at the end.

Price, Deposits, and When Money Moves

Be clear whether you are on a fixed price for the job or paying an hourly rate, because they behave very differently. A fixed price puts the risk of the job taking longer on the contractor, which is usually what a homeowner wants. An hourly rate is fair for genuinely unpredictable work, such as chasing a leak or opening up an old floor, but agree on what a day means in hours and roughly how many days are expected. Confirm whether the figure includes sales tax.

On deposits, a modest amount to secure materials or a slot is normal and reasonable. A large payment demanded up front, especially in cash, is not. Better still is a staged schedule tied to visible progress: something at the start, something at an agreed midpoint, and a meaningful final payment held until the work is complete and you are happy. Keep that final slice big enough to matter. Pay by check, bank transfer, or card so there is a clean record, and get a receipt each time.

Dates, Hours, and Who Supplies What

Access, Keys, Parking, and the State of the House

Decide how they get in. If you are out at work, are you giving a key, using a lockbox, or will someone be home? Say plainly whether you are comfortable with the house being empty while work happens, and if you are not, arrange it differently now rather than resenting it later.

Sort parking, permits, and where a van or dumpster can sit, especially on a permit-parking street. Agree on which bathroom and which faucet they can use, whether there is anywhere to make a drink, and whether you have pets or small children whose routine needs protecting. Confirm who is responsible for waste removal and whether dumpster rental is included in the price, because debris left in the yard is a classic end-of-job argument. Finally, ask how the site will be left each evening, particularly if you are living in the house through the work.

Insurance, Permits, and What Happens if Something Goes Wrong

Ask to see their general liability insurance and note the expiration date, and ask about workers' compensation coverage if they are bringing a crew. For gas, electrical, HVAC, or structural work, establish which permits the job needs, who pulls them, who schedules the inspection, and what paperwork you will hold at the end. Confirm that all of this is included rather than an extra. Those documents are not paperwork for its own sake: they are what a buyer's attorney will ask for when you sell.

Ask what guarantee is offered on the workmanship and for how long, separately from any manufacturer warranty on the parts. Then agree on the least comfortable point of all: what happens if something unexpected is found once a wall or floor is open. Old houses hide things, and discovering an unsupported joist is nobody's fault. What you want agreed before work starts is the process, which is that work pauses, you are told, you get a price for the extra, and you approve it in writing before it goes ahead.

The Punch List and the Final Payment

Agree upfront that when the job is declared finished you will walk it together and build a punch list. Small imperfections are normal on almost any job; the question is only whether they get put right promptly. Do the walk in daylight, write down what you find, agree on a date for those items, and release the final payment once they are done. Handing over the last of the money before you have looked properly removes the only leverage you have, and a contractor who is confident in their work will not mind waiting a few days for it.

Common questions

Is it rude to ask a contractor to put everything in writing?

No, it is completely standard and most welcome it. A written scope protects both sides from remembering the job differently later. If someone refuses to confirm the basics in writing or by email, treat that as a reason to think again.

How much deposit is reasonable?

Enough to cover materials or secure a booking, not a large slice of the total. Where significant items are being ordered in, paying for those specifically is fair. Be very cautious about large cash sums requested up front before anything has been delivered or done.

What if the job takes longer than agreed?

On a fixed price, extra time is generally the contractor's risk rather than yours, which is exactly why fixed prices suit most household jobs. Delays do happen for genuine reasons, so agree at the outset that you will be told early rather than discovering it on the finish date.

before work startswhat to agree with a contractorcontractor deposit and payment schedulegetting a job in writing

Describe your job and a verified local contractor comes back with a priced quote you can accept online.

Get a real quote →

Planning a job at home? Design the room, save your ideas and get quotes in the FixTrade app.

See the app →