Shop › Bathrooms › Wet room or walk-in shower
That combination is not available. Choose another option.
A level, open shower with no tray to step over. Local fitters form the floor, waterproof the room fully, tile it and fit the drainage and screen.
| Good to know | Proper waterproofing is the whole job. Ask how the room will be tanked. |
|---|---|
| Usually includes | Floor former and drain, tanking (waterproofing), tiling, shower, screen |
| Typical time on site | 1 to 2 weeks |
Whether the whole floor is the shower or you want a low tray with a screen.
The style of drain in the shower floor, which affects how the floor slopes.
How the shower walls are finished.
Optional comforts added during the build.
Your postcode and the job in your own words. Photos help but are not required.
Tradespeople who cover your address see the request, and each profile shows the checks that tradesperson has passed.
On your own page, with a link you keep. It updates itself as responses come in.