A bathroom refit is one of the most trade-dense projects in a house: plumbing, joinery, tiling, sealing and often electrics, all inside the smallest room and all in a fixed order. So what does a bathroom fitter do? They are the specialist who owns that whole sequence. Some are multi-skilled individuals doing most of it personally; others lead a small team and bring in an electrician or plasterer at the right moments. Either way, what you are really buying is the sequencing: hundreds of small decisions landing in the right order so the room finishes watertight, level and neat.
The work a bathroom fitter handles
- Strip-out: removing the old suite, tiles and flooring, and dealing with the surprises behind them
- First-fix plumbing: moving or renewing hot, cold and waste pipework to suit the new layout
- Installing the suite: bath or shower tray and enclosure, basin, toilet, taps and shower valve
- Making walls and floors ready: boarding, levelling, and waterproofing wet zones before tiling
- Tiling walls and floors, or fitting wall panels where those are chosen instead
- Second fix and finishing: silicone sealing, flooring, radiator or towel rail, accessories, and the final commissioning of everything wet
What they bring other trades in for
Two boundaries matter. Gas work, such as moving a boiler that lives in the bathroom, belongs only to an engineer registered for gas. Electrical work in bathrooms, lighting, extractor fans, electric showers, shaver points, is tightly restricted because of the water around it, and the wiring side belongs with a qualified electrician, whom good fitters have on call. A fitter who shrugs at either boundary is a warning sign worth heeding. Plastering, glazing and structural alterations are the other common guest appearances, and part of a good fitter's value is having reliable people for each rather than improvising.
How a typical refit runs
Expect a survey visit before any quote worth having: measuring, checking water pressure, lifting the odd inspection cover, and talking through the layout. The job itself usually opens with a day or two of strip-out and first-fix, a noisy start that makes the room look worse than you imagined possible. Mid-project is boarding, waterproofing and tiling, the stage where progress looks slow because so much of it disappears behind surfaces. The final stretch is fitting the suite, sealing, flooring and snagging. A straightforward family bathroom commonly runs one to three weeks depending on tiling extent and drying times, and a fitter who promises the whole thing in a weekend is describing a different job than the one you want.
Comparing quotes like a professional
Get quotes against the same written scope, ideally with the same drawings or sketch, because bathroom quotes diverge mostly through what they quietly exclude. Check each quote states who supplies the suite, tiles and fittings; whether strip-out and waste disposal are included; what happens if the floor or walls behind the old tiles turn out to need work; and how the electrical parts will be certified. Staged payments tied to progress are normal; large upfront sums are not. Our guides on what to agree before work starts and the checks before hiring a tradesperson apply here in full, and a portfolio of finished bathrooms with a reference you can actually call remains the single best filter.
Fitter, plumber or the whole crowd?
For a like-for-like swap of a single item, a broken basin, a new tap, a plumber is the right call, and our guide on what a plumber does covers that trade. A full refit with tiling and layout changes is exactly what a bathroom fitter does. For loft conversions and extensions where a bathroom is one room among several, the main contractor usually coordinates and a bathroom specialist may subcontract the fit. If you are unsure which you need, describe the whole job when you post it, photos and all, and let the responses tell you how the trades themselves see it: the ones who ask good questions about waterproofing, ventilation and pressure are the ones who have done it well before.
Common questions
Do bathroom fitters do the tiling themselves?
Many do, and take pride in it; others bring in a tiler for large formats or intricate patterns. Ask who will tile yours and to see photos of that person’s finished walls, since tiling quality is the most visible part of the whole job.
How long does a bathroom refit take?
A straightforward swap-in-place commonly takes one to two weeks; layout changes, extensive tiling or drying-time-heavy jobs stretch towards three. Beware round-number promises made before anyone has seen the room.
Should I buy the bathroom suite myself or let the fitter supply it?
Either works if the quote says which. Fitter-supplied usually means trade pricing and one person responsible for damaged or missing parts; buying yourself widens choice but makes delivery timing and defects your problem. Decide before quoting so every quote assumes the same.
Describe your job and a verified local tradesperson comes back with a priced quote you can accept online.
Get a real quote →





