Two different sets of rules can apply to work on a house, and homeowners mix them up constantly. Planning permission is about what your building looks like and how it affects the area around it. Building regulations are about how the work is actually built: structure, fire safety, insulation, ventilation, drainage, electrical safety and access. A job can need one, both, or neither. A rear extension may well need both. Rewiring a bathroom needs no planning permission at all but is still covered by building regulations.
The regulations are a legal minimum standard, not a matter of taste, and responsibility for compliance sits with the building owner as well as the builder. That is worth knowing before you agree to anything, because the person left holding the problem when a house is sold is you.
Common household jobs that are notifiable
This is not an exhaustive list and local building control will confirm your specific case, but the following are the jobs a homeowner most often finds need building regulations sign off.
- Structural alterations: removing or altering a load bearing wall, forming a new opening, installing a beam, or underpinning.
- Loft conversions and garage conversions, which involve structure, fire escape and insulation together.
- New or relocated drainage, and a new bathroom or shower room where drainage or mechanical ventilation is being added.
- Replacement windows and external doors in an existing home, which must meet thermal, safety glazing and escape requirements.
- Certain electrical work in England and Wales under Part P, principally new circuits, replacing a consumer unit, and work in a room containing a bath or shower. The scope is somewhat wider in Wales than in England, so check which applies to you.
- Installing or replacing a boiler, heating system or a solid fuel appliance and its flue.
- Insulation work and upgrades to what the regulations call thermal elements, such as a roof, wall or floor, particularly where a substantial proportion of the element is being renovated or recovered.
- Altering or replacing a significant area of roof covering, which can trigger an insulation upgrade at the same time.
Plenty of work does not need building regulations approval at all. Redecorating, replacing like for like fittings, most kitchen refits where no new circuits or drainage are involved, repairing rather than replacing, and general repairs and maintenance sit outside the regime. Swapping a socket faceplate is not notifiable; running a new circuit to a garden office is.
The two ways to get approval
Where work is notifiable, there are two normal routes. A full plans application means drawings and specifications are submitted and checked before work starts, and you get a decision you can build to. It suits anything structural or complex, because errors are caught on paper rather than in brickwork, and lenders and buyers like the paper trail.
A building notice is the lighter route. You notify building control shortly before starting, without detailed drawings, and the work is inspected as it proceeds. It suits smaller, straightforward domestic jobs. The trade off is that nothing has been checked in advance, so if an inspector is unhappy at first fix, the cost of putting it right falls on you. Building control itself can be your local authority's team or a private approved provider, and either way the job is inspected at key stages and signed off at the end.
Competent person schemes: when your installer handles it
For a lot of common work you never contact building control yourself, because the installer is registered under a competent person scheme and self certifies their own work. They notify the local authority on your behalf and issue you a certificate. Gas appliance work sits with Gas Safe registered engineers, electrical work with schemes such as NICEIC and NAPIT, replacement windows and doors with schemes such as FENSA and CERTASS, and solid fuel appliances with HETAS.
Two practical points follow. First, confirm before the job starts that your installer is genuinely registered for that specific type of work, and that the notification and certificate are included in the price rather than an extra. Our guide on what to agree before work starts covers how to nail that down. Second, if an installer is not registered, the work can still be done legally, but it then has to be notified to building control separately and inspected, which costs more and needs arranging in advance rather than afterwards.
Why the completion certificate matters
When notifiable work is finished and passes final inspection, you receive a completion certificate, or a scheme certificate where an installer self certified. Put it somewhere safe with the rest of the house paperwork. It is the document that proves the work was done to standard, and the moment it earns its keep is when you sell. A buyer's solicitor will ask for certificates covering any obvious alterations, and the absence of one can slow a sale, knock money off the price, or cause a lender to hesitate.
What if work was already done without approval?
This happens more often than people admit, sometimes because a previous owner did it and never mentioned it. Do not panic, and do not simply hope nobody notices. Where notifiable work was carried out without approval, you can apply to your local authority for a regularisation certificate. That means opening up parts of the work so it can be inspected, putting right anything that falls short, and paying a fee, after which the council can certify what it has been able to check.
Local authorities also have enforcement powers and can require non compliant work to be altered or removed, so a genuine safety problem is worth resolving on its own merits rather than for the paperwork. Where regularisation is impractical, sellers sometimes use an indemnity insurance policy at the point of sale, but that only covers the financial risk of enforcement. It does not make unsafe work safe, and it is no substitute for having a competent tradesperson check anything structural, electrical or gas related.
Scotland and Northern Ireland work differently
The system described above is England and Wales. In Scotland the equivalent is a building warrant, which must be obtained from the local authority before the work begins rather than notified as you go, and a completion certificate is submitted and accepted at the end. Northern Ireland has its own Building Regulations, administered through district council building control. The underlying principles are similar, but the process, the terminology and the exemptions are not identical, so use your own council's building control service as the authority on what your job needs. A quick call before you commit is free, and it is a far better use of ten minutes than a regularisation application two years later.
Common questions
Is building regulations approval the same as planning permission?
No, they are separate regimes and you can need one, both or neither. Planning permission concerns the appearance and impact of a building on its surroundings. Building regulations concern how the work is constructed, covering structure, fire safety, insulation, ventilation and drainage.
Does a kitchen refit need building regulations approval?
A straightforward refit that reuses existing services usually does not. It becomes notifiable if you add a new electrical circuit, replace the consumer unit, alter drainage, add mechanical ventilation, or remove a load bearing wall to open the space up. Confirm your specific plan with building control.
Who is responsible if the work does not comply?
Legal responsibility rests with the building owner as well as the person carrying out the work, which is why the paperwork matters to you and not only to your builder. Agree in writing before the job starts who is notifying building control and who is providing the certificate at the end.