Do you need planning permission for air conditioning?

3 min readPublished

Most people assume an outdoor unit on the back wall needs the council's blessing. Since 2025 that is often not the case in England, but there is one detail in the rules that catches people out. Here is how planning permission for air conditioning works for a house, and the separate question of who is allowed to fit it.

Planning permission for air conditioning in England

A modern split air conditioning system is, technically, an air-to-air heat pump. On 29 May 2025 an amendment to the permitted development rules in England brought air-to-air heat pumps into the same rights that air-to-water heat pumps already had. That means many homes can fit one without applying, as long as the installation meets the conditions in the legislation. The main ones are:

The cooling-only catch

This is the part that surprises people. The legislation says a unit fitted under these rights must not be used solely for cooling. A reversible system that heats in winter and cools in summer fits the rules. A cooling-only unit does not, so it falls back on a normal planning application. Almost every wall-mounted split sold for homes today can heat as well as cool, so in practice this mostly matters if you are offered an older or cheaper cooling-only model.

When you will need to ask the council

If you are unsure, the Planning Portal explains the rules, and you can apply for a lawful development certificate for written confirmation.

Why the engineer needs F-gas certification

Planning is about where the unit goes. Who fits it is a separate law. A split system contains refrigerant, a fluorinated gas, and in Great Britain anyone who installs, services or recovers it must hold an F-gas qualification. Their company must also hold F-gas certification from an approved body, and this applies to sole traders too. Ask any installer for the company certificate number before work starts. Units sold with pre-filled quick connectors still need a qualified person to connect them properly.

The electrical side matters as well. A new dedicated circuit is notifiable work under Part P of the Building Regulations in England and Wales, so it needs a registered electrician or a building control notice, and you should get a certificate at the end.

Common questions

Do I need planning permission for an air conditioning unit on my house?

In England, often not. Since 29 May 2025 air-to-air heat pumps can be fitted under permitted development if they meet the size, position and noise conditions and are not used solely for cooling. Listed homes, some conservation areas and Article 4 areas still need permission.

Can I fit air conditioning myself?

Not a split system. Connecting the refrigerant circuit must be done by an F-gas qualified engineer working for a certified company. Portable units that plug in and vent through a window need no installer.

What is an F-gas engineer?

An engineer qualified to handle fluorinated gas refrigerants used in air conditioning and heat pumps. Their company must hold F-gas certification from an approved certification body.

planning permission for air conditioningf gas engineerair conditioning permitted developmentair conditioning regulations uk

Home air conditioning. Describe your job and a verified local tradesperson comes back with a priced quote you can accept online.

Request a quote →

Planning a job at home? Design the room, save your ideas and get quotes in the FixTrade app.

See the app →