Across the UK, the typical range for a standard replacement fuse board (consumer unit) is £500 to £900. Prices include VAT where the tradesperson is VAT registered. Many sole traders are not, so ask whether VAT is added.
| Job | Typical range |
|---|---|
| Standard replacement consumer unit, up to about 10 circuitsper installation | £500 to £900 |
| Larger consumer unit, or one needing extra circuits or repairs to existing wiringper installation | £800 to £1,400 |
These figures are estimates to check a quote against. They are not a quote or an offer, and FixTrade does not set what tradespeople charge. The only real price is a written quote for your own home. Ranges checked November 2026.
What moves the price
- The number of circuits, which sets the size of the unit
- Individual protection on each circuit (RCBOs) costs more than a split unit with two shared devices
- Faults found on old circuits during testing have to be put right before the new unit can be certified
- Upgrading the main earthing and bonding to gas and water pipes adds work
- A board that has to move, or meter tails that need replacing, adds time
- Planning for a car charger, solar panels or an extension means a larger unit now
What a quote should include
- The new consumer unit with protective devices for each circuit
- Surge protection where the regulations call for it
- Disconnecting and removing the old fuse board
- Testing every circuit in the house
- An Electrical Installation Certificate and Building Regulations notification
Rules that apply
- In England and Wales replacing a consumer unit is notifiable work under Part P of the Building Regulations; a registered electrician self-certifies it and you receive a compliance certificate.
- Consumer units in homes must have a non-combustible (metal) enclosure and meet the current wiring regulations (BS 7671), which also require residual current protection on most circuits.
- You should be given an Electrical Installation Certificate with test results for every circuit.
Typical prices by place
Labour is about 60% of the price of this job, and labour costs more where pay is higher. The ranges below adjust that part for each region.
East
East Midlands
London
North East
North West
South East
South West
Wales
West Midlands
Yorkshire and the Humber
Common questions
Why might the final bill be higher than the quote for a new consumer unit?
Testing sometimes shows faults on old circuits that must be put right before the unit can be certified. Ask for an inspection first, or for a clear hourly rate for any repairs.
Do I need a new consumer unit before a car charger or solar panels?
Not always, but an old board with no spare capacity or no residual current protection usually needs upgrading, which typically adds £400 to £800 to that job.
Is a unit with individual circuit protection worth the extra?
It typically adds £100 to £200 in parts. A fault then trips one circuit instead of half the house, which is why most electricians now quote this as standard.
Sources
- Planning Portal
- Office for National Statistics, Annual Survey of Hours and Earnings 2025: median hourly pay excluding overtime, full-time employees, by place of work
- Office for National Statistics, Census 2021 (England and Wales): tables TS046, TS044 and TS054
- Valuation Office Agency, Council Tax: stock of properties, 31 March 2026 (table CTSOP4.1)
The only real price is a quote for your home. Describe the job and tradespeople who cover your address can send you one.
Get quotes for this job →

